Date: November 2013
By the end of 2013, PSC has renewed the management systems certificates ISO 9001/2008, ISO 14001/2004 and OHSAS 18001/2007.
PSC thanks all departments who contribute in achieving the second renewal of management systems certificates and congrats all employees.
Date: November 2012
STF (The EPC Contractor) awarded PSC a new contract of construction of 6 HRSG in Giza North Combined Cycle Power Plant (3X750 MW).
PSC scope of work is complete construction of 6 HRSG includes:
- Main Steel Structure
- Casing
- Boiler Harps
- Drums
- Stacks
- Internal & External Piping
In addition, STF awarded PSC a separate contract of pre-fabrication of Internal and External Piping of the said project.
An amount of 1850 tons will be pre-fabricated by PSC factory (Located in Alexandria) and will be delivered to the site to be erected.
Giza North Power Plant is a new huge power complex project located in Giza in Egypt.
The plant consist of 3 Modules, Each module consist of 2 Gas Turbine (which produce 250MW each) and 2 HRSG’s that convert water to a superheated steam (by the exhaust resulting from the gas turbines) and 1 Steam Turbine (Produce 250MW).
Each module will produce 750MW with total capacity for the project 2250MW.