Alexandria East - Waste Water Treatment Plant

Location: Alexandria, EGYPT.
Client          : Degremont S.A - (Spain)

Fabrication and Electro-Mechanical Erection for Phase I and Phase II including:

  • Secondary clarifiers.
  • Air networks.
  • Mechanical Bridges.
  • Sludge Silo frame.
  • Puddle pipes.
  • Conveyor structures.
  • Stainless steel and UPVC pipes (Pre-Fabrication and erection)
  • Rotary equipment (Motors , Pumps, ...etc)
  • Stationary equipment (Tanks, Vessels, overhead cranes,...etc)