El-Kurimat III Combined Cycle Power Plant

El-Kurimat Combined Cycle Power Plant III – CCPP (750 MW)
Location:
 BANI SWAIF, EGYPT.

    Electromechanical Installation for 2 x 250 MW CCPP Gas Turbine.    Siemens
•    Steel Structure fabrication & Erection for Gas Turbine.                  Siemens
•    Balance of Plant (BOP) piping and Equipment.                                   Siemens
•    Erection of bus Duct – Aluminium.                                              Siemens
•    Erection 2 Air intakes.                                                             Kafear Raco