New Abu Qir Thermal Power plant ( 1300 MW)
Location: Abu Qir, EGYPT.
Client: Ansaldo Caldaie - Italy
• Welding and fitting works of Header to coils joint at site.
• Piping works Pre-fabrication.
• Engineering, Supply and fabrication of ASME coded Blow Down Tanks / Vessels.